The project is located in the hinterland of the Sahara desert of Niger, the main scope of the work is:the construction of 1 united station, 1 oil and gas transfer station, 5 metering stations, 22 single wells, and more than 200 km of gathering and transportation branch pipelines. The production capacity of the project is 1 million tons.